Queensland Law Society

A refurbishment of the building’s air conditioning system involved the upgrade of the existing standalone electronic control system to a modern state of the art BMS allowing user interaction and increasing functionality to provide a more cost effective system.
Cutover works were completed outside of normal working hours to minimise occupant impact.
A new VRF system was installed on across a number of floors to meet particular requirements of spaces in addition to the floor AC and VAV system. The VRF system is integrated into the BMS via BACnet high level interface allowing remote control and monitoring of the third party system.
