Pacific Fair Shopping Centre

Systemax is currently engaged in a complete replacement of the incumbent Continuum BMS as part of a package aimed at reducing energy consumption throughout the centre.

Energy initiatives as part of the new BMS involve fine tuning of control functionality to provide comfortable space conditions without compromising efficiency.

The new BMS will monitor an extensive network of Smart energy meters and control plant operation relative to energy usage.

Works are due to be completed mid 2012.

  • Santos Place is one of a few 6 Star Greenstar commercial buildings in Australia currently performing to a 5 star NABERS Energy rating. As such, overall building performance via the BMS is critical in optimal energy management. Systemax supplied and installed the site BMS and have excelled in their diligence for ongoing plant and equipment tuning to optimise energy performance. Systemax’s approach to quick and professional support via the web based platform provides an assurance that facility management issues are easily dealt with in a timely manner.

    Robin Smith - Senior Facility Manager – Global FM

  • I have been dealing with Systemax for the last 6 years and cannot recommend their services highly enough. With their state of the art BMS product, combined with extremely efficient installation and programming skills, they always deliver. It's going the extra mile that sets Systemax apart from their competitors.

    Phil O'Connor - Facilities Manager - Australian Property Growth Fund

  • All too often contractors fall short of their commitments. We have engaged Systemax on various projects ranging from simple unit controls, to full 50,000m2 complex BMCS retrofits. Systemax have proven their commitment to delivery time and time again. Their levels of services have rebuilt my faith in the Building Automation industry. The WebCTRL interface is one of the best we have worked with, giving the user real control and useful feedback anywhere, anytime. We would recommend Systemax services and product, and will use them again.

    Brenden Lamberth - Managing Director - Facility Operations Pty Ltd- May, 2011

  • Queensland University of Technology (QUT) has engaged Systemax on a continual basis for the last 6 years. Their works have incorporated ongoing BMS rectification works, fault finding and ongoing system tuning to maximise optimal energy management control strategies. Systemax has directly contributed to QUT achieving significant energy consumption reductions associated with the day to day operation of air conditioning systems. Their quality of staff, diligence and professional attitude applied to all tasks they are involved with is a credit to Systemax and make them a pleasure to work with.

    Geoff Woods - Manager, Engineering Services – QUT Facilities Management Department

  • In my 30 years experience in the building services industry and having gone through quite a few major BMCS upgrades and / or replacements in that time, I have never experienced a project of this magnitude go so smoothly – particularly in an occupied building (which we all know is a potential nightmare if not approached correctly and sensitively). It is a credit to you all, and a shining example of what can be achieved when a project is properly planned and resourced by people who have a passion to deliver a first class service.

    Trevor Ford – Ford Consulting – Waterfront Place Retrofit – September 2007